Bermondsey CCU Replacements

Introduction London Underground identified a number of Jubilee Line stations in which the existing Edenaire HVAC units were beyond economical repair. We were awarded the contract to replace these units with new Airedale models, improving the reliability and sustainability of

London Midland Fitters Refurbishment Works

Quinn Infrastructure under their existing LNW minor building work framework was appointed by Network Rail as the Principal Contractor for these refurbishment works. The London Midland (LM) subsurface accommodation located in the East Dock at Birmingham New Street station…

Northumberland Park Depot Boiler Replacement Project

Northumberland Park Depot (NPD) was brought into use in the late 1960’s to stable and service London Underground’s (LU) Victoria Line trains. NPD is the only depot currently serving the Victoria line. The hot water and heating system at the depot also dated back to the 1960’s…